    Planning a split system air conditioner starts with the room and the way you use it, not simply choosing a unit from a catalogue. This guide explains the checks to make before installation, the parts of a complete installation and what to review at handover.

    Match the system to the room

    Room size is only part of the assessment. Ceiling height, insulation, glazing, afternoon sun, occupancy and heat from appliances all affect the load. An open-plan living area, top-floor bedroom or west-facing room may have different requirements from a shaded room of similar floor area.

    An undersized unit can struggle to reach the selected temperature. Oversizing can cause short cycling and poor moisture control. Discuss which areas need heating and cooling, how often they are occupied and whether doors remain open to adjoining spaces. Choose capacity based on that assessment rather than assuming a larger unit is always better.

    Plan indoor and outdoor positions together

    The indoor unit needs clear airflow across the occupied area. Furniture, curtains and bulkheads should not obstruct it. Consider whether the air would blow directly onto a bed, desk or seating position and whether the unit will be accessible for filter cleaning and future servicing.

    The outdoor unit needs stable mounting and the clearances specified by its manufacturer. Stored items, plants and decorative screens must not restrict ventilation. Discuss noise near bedrooms, neighbouring boundaries and entertaining areas. In coastal locations, consider salt exposure while preserving adequate airflow.

    The shortest pipe run is not necessarily the best arrangement. A different route may suit airflow, servicing access or drainage better. Agree the route and visible finish before installation rather than assuming every property suits the same layout.

    Give condensate drainage a clear route

    Cooling removes moisture from indoor air, so the installation needs an appropriate drain route. Plan where that water will discharge without creating a slip hazard, damaging surfaces or dripping onto an entry, neighbouring property or electrical equipment.

    The drain needs suitable fall. Where gravity drainage is not possible, discuss whether a condensate pump is necessary and how it will be maintained. Refrigerant pipework also needs appropriate insulation and protection from physical damage; external covers can protect the line set and keep the finish tidy.

    Check the electrical supply before installation

    A split system places demand on the electrical installation. The installer needs to assess circuit capacity, suitable protection, isolation and switchboard condition alongside the unit’s requirements. Existing high-demand appliances and planned additions should be considered rather than checking the new unit in isolation.

    A dedicated circuit and isolator form part of the installation scope. A switchboard check determines whether modifications or an upgrade are needed; a new air conditioner does not automatically require a complete board replacement. Electrical connections and refrigerant work are not DIY tasks.

    Understand the complete installation scope

    All Phase Electrical supplies and fully installs reverse-cycle split systems, including Daikin, Mitsubishi and other brands. The unit, indoor and outdoor installation, refrigerant pipework, dedicated circuit and isolator, switchboard check, commissioning and rubbish removal are handled in one job by licensed technicians.

    For the service scope and a free quote, see split system air conditioning supply and installation. For planning a new system or replacing an existing unit, see Daikin and Mitsubishi split system installation. These service pages are separate from this informational guide.

    Check operation and handover

    Commissioning should check that the system operates as intended after installation, including electrical connection, drainage and system performance. Ask how to use the controller, remove the filters safely and recognise a fault that needs professional attention.

    Keep outdoor airflow clear and clean filters according to the manufacturer’s instructions. Indoor leaks, unusual noises, reduced performance or repeated circuit trips warrant assessment rather than repeated resets or attempts to open electrical or refrigerant components. Our split system maintenance guide covers safe routine care.

    Licensed & Insured

    Fully compliant

    Quality Workmanship

    Australian Standards

    Fast Response

    Emergency available

    All Phase Electrical is a licensed and insured local electrical business based in Ormeau, servicing Gold Coast, Logan and Brisbane South. We provide professional, safe, and compliant electrical services for residential and commercial clients.

    Call Now: 0403 013 023